Plant Planning on a Brownfield site

Products

Contact

Phone +49 7142 78 - 1543

pfs(at)durr.com

QuickLinks

Plant planning on a brownfield site

Brownfield paint shops are constructed at existing sites with available infrastructure. The new plants must be integrated into existing production processes accordingly.

When planning new plants in existing factories, various criteria must be taken into account, such as:

  • The process sequences of the existing paint shop/s
  • Implementation during ongoing production
  • Interfaces to existing plant technology
  • Dependence on stoppages
  • Special layout solutions

We can adapt our production services to your needs and project status.

Our services:

  • Determination of the actual status (plant assessments)
  • Concept studies
  • Technical plant design
  • Process design
  • Detailed planning
  • Interface descriptions
  • Creation of the layout (3D laser scanning)
  • Material flow simulation
  • Preparation of tender specifications
  • Support with creating approval documents
  • Master schedule from order placement through to SOP
  • Cost indication for implementation

    Your benefits:

    • Deployment and definition of the latest paint shop technology for the project
    • Definition of your specific requirements with neutral planning
    • Creation of bid pack documentation
    • Very short time period between project decision and order placement
    Dürr News